Tempo logotype
7 min read

Understanding the 6 stages of a production schedule

From Team '23

Tempo Team

When it comes to the intricate process of turning ideas into tangible products, few things are as essential as a well-crafted production schedule.

Like a conductor arranging a variety of instruments to create a masterpiece, a production schedule orchestrates the various elements of design, manufacturing, and delivery to bring the final product to life. Let’s delve into the world of production schedules — their significance, key components, and how they play a pivotal role in ensuring smooth operations.

What’s a production schedule?

A production schedule is an inventory management tool that tracks every single product a company manufactures, including point of origin, raw materials, and supply chain details. The comprehensive document requires constant updating and built-in contingencies to avoid bottlenecks and manufacturing delays.

Production scheduling examines eight elements of your manufacturing workflow:

  1. Distribution (parts): A well-crafted production schedule guides the distribution of assembly components to workers. By ensuring the right parts are allocated correctly and in sync with production flow, the schedule mitigates bottlenecks and reduces downtime.

  2. Distribution (labor): The production schedule serves as a record of labor hours, overtime tracking, and staffing levels. This transparency helps ensure the right workforce is available at the right time to match production demands.

  3. Inventory levels: Aside from maintaining stock levels, scheduling helps keep the warehouse organized by tracking everything going in and out.

  4. Equipment status: A great production schedule takes a proactive approach to equipment management. By consistently analyzing performance and status, you can address maintenance needs and prevent unplanned downtime and costly replacements.

  5. Financial allocations: A robust production schedule is a powerful financial tool. By mapping out resource allocation and costs, the document can aid resource management and help you address unforeseen financial challenges.

  6. Product quality: Consistent inventory management, precise part distribution, and efficient labor allocation means a higher output of quality products within tighter timeframes.

  7. Customer satisfaction: With high-quality products rolling off the assembly line, orders are fulfilled accurately and on time, fostering customer trust and loyalty.

  8. Brand reputation: The positive ripple effect of a well-executed production schedule extends to your brand. Full optimization of manufacturing processes results in products that meet or surpass customer standards, contributing to an exceptional brand reputation in the market.

Why is production scheduling important?

Creating a production schedule is integral to an effective manufacturing process, as it works to improve production time, reduce costs, and bolster product inventory controls. Along the way, you'll find that improving those processes leads to less waste and a path to efficiency devoid of roadblocks.

Here are four more benefits of a production schedule:

  1. Assists with planning by predicting labor, material, and equipment demands

  2. Acts as a scheduling resource by allocating labor resources based on demand

  3. Helps manage inventory by carefully maintaining output levels amidst fluctuations in supply or surges in demand

  4. Improves efficiency by reducing downtime and bringing awareness to bottlenecks

Production planning versus production scheduling

Production planning and scheduling operate on different scales and serve distinct purposes within the manufacturing process. Production planning is much broader in scope, covering strategies for optimizing the manufacturing and delivery processes over months or years. In contrast, production scheduling operates on a short timeline, focusing on the efficiencies of production in the here and now.

Unlike planning, production scheduling must be flexible enough to roll with the punches. Changes in supply, financial constraints, or equipment demand a schedule that can keep up with preset production levels without missing a beat.

The 6 stages of production scheduling

The manufacturing process is complex and full of constant change — that's why scheduling is a critical production management process meant to create efficiencies, optimize workflows, and organize everything from the supply chain to labor.

Here are the six stages of production scheduling for crafting your own document:

1. Planning

During the planning stage of production scheduling, you must compile and analyze all resources and associated costs to meet the preset manufacturing goals. There are two types of planning to choose from:

  • Static planning assumes there will be no changes to the schedule and everything will run successfully without interference

  • Dynamic planning accounts for changes to the schedule, a more flexible option that allows for shifts in the process to maintain output

2. Routing

This stage is all about pathfinding. The first path is determining the best way to convert raw materials or supplies into a finished product. The second path is how that finished product enters the consumer-facing marketplace. Your goal is to root out inefficiencies where these two paths converge to be as cost-effective as possible.

3. Scheduling

The scheduling stage encompasses the creation of a timeframe for each stage of production, as well as the final deadline for the entire project. There are three types of scheduling:

  • A master production schedule includes budget, labor, and resource projections to manufacture a product within a specific timeframe

  • A manufacturing schedule is a specific production plan that lays out the process for converting raw materials into a finished product

  • The retail operations schedule is similar to the master production schedule but centers around prepping products for retail distribution instead of direct-to-consumer sales

4. Dispatching

Ensure all resources, people, and budgets are in line. Then, distribute any guidelines or role-related rules to the labor force and kick off production.

5. Realizing

There’s excitement in the air, the machines are whirring, and the finished products are rolling off the line. But your job is far from over — you must closely monitor operations to ensure processes are at maximum efficiency and stakeholders receive products on time.

6. Maintaining

During the production process, there will likely be tweaks and roadblocks. These changes will affect the schedule and, potentially, the delivery of finished products. It's integral to consistently update this “living” document and make the necessary adjustments to maintain workflow. Be sure to share the schedule and subsequent updates with all team members to ensure everyone is on the same page.

Factors to consider in production scheduling

While creating a production schedule, there are five factors that should always be at the forefront of your mind. These are relevant throughout the entire production process and should influence your decision-making:

  1. Time management: A well-crafted production schedule is a time-driven map that guides the entire manufacturing process, ensuring products are delivered to market on schedule and customers are satisfied.

  2. Materials handling: Successful production hinges on having the right materials at the right time. Effective sourcing, storage, and inventory management are pivotal to ensuring uninterrupted production.

  3. Strategic workforce allocation: A crucial responsibility of a production schedule is orchestrating the workforce. Adequate staffing levels, skill alignment, and precise scheduling of workers breathe life into the manufacturing process.

  4. Machine use: The crowning jewel of any production facility is its machinery. Machinery downtime directly impacts productivity and can create cascading delays, so ensuring equipment is functional and well-maintained is a non-negotiable.

  5. Financial viability: A comprehensive production schedule takes into account all costs, from raw materials to labor and overhead, guaranteeing each project is both financially feasible and properly funded.

How to optimize production scheduling

There are a number of production planning tools that can lend you a helping hand, from scheduling software filled with bright Gantt charts to material requirement planning (MRP) graphs and production calendars. But regardless of the planning tools you choose, there are two distinctly different methodologies to consider as you work to optimize production scheduling:

Capacity planning

Capacity planning focuses on available resources and efficient product delivery to enhance customer satisfaction. This planning method emphasizes resource management to ensure there is enough to complete a project and meet any agreements.

There are two types of capacity planning:

  • Finite assumes limits are set on labor hours, resources, and equipment

  • Infinite assumes no such limitations exist, so your production capacity is essentially undefined and limitless

Forward and backward scheduling

This method of scheduling is all about production order: The product's due date or starting point determines the timeline structure.

Forward scheduling begins with the earliest step in the process, then builds the schedule out from there. Backward scheduling starts with the due date and backfills the schedule accordingly. Backward scheduling works well for hard deadlines, while forward is best for open-ended dates or continuous production.

Bolster your projects with Strategic Roadmaps

When it comes to project management, having a reliable and efficient tool can make all the difference. To map your projects’ progress, create a roadmap with Strategic Roadmaps. The platform functions like a finely tuned production schedule, ensuring every aspect of your project plan moves seamlessly from inception to completion. And with Timesheets by Tempo, you can keep a vigilant eye on the clock, making sure that each task aligns with the timeline you've crafted in your roadmap.

Tags

  • Strategic Roadmaps

Strategic Roadmaps

Strategic roadmapping

Build your portfolio vision with Strategic Roadmaps. With powerful visualization capabilities, you can communicate strategy to the entire organization and gain alignment around strategic objectives, product goals, and milestones.

Start a Free Trial
Special Offer

Explore More Content

Jira ITSM Solutions with Tempo

ITSM

Build and scale a custom ITSM solution at your own pace with Tempo's modular suite of integrated tools. Enhance Jira's capabilities and take control of your entire IT portfolio.

Learn more

Align strategy and execution

Structure PPM and Strategic Roadmaps

For planning leaders looking to add a big-picture roadmap view to their structured Jira data, this integration is essential. Improve visibility to leadership, reduce reporting admin, and keep your team aligned.

Learn more

Custom charts and dashboards for Jira

Custom Charts for Jira

See how work is progressing and where blockers are with the most flexible reporting app in Jira.

Learn more

No-code Tableau Jira integration

Tableau Connector for Jira

Effortlessly bridge Jira with Tableau, unlocking unparalleled insights and enhancing decision-making

Learn more

No-code BigQuery Jira integration

BigQuery Connector for Jira

Integrate Jira with Google BigQuery to seamlessly export and sync data for advanced analytics and customized reporting

Learn more

Strategic Portfolio Management

Strategic Portfolio Management

Modern modular PPM solutions that scale with your business. Align your teams with the integrated platform that bridges the gap between strategy and execution.

Learn more

Agile at Scale Software

Agile at Scale

Adapt to changing business needs, rapidly adjust plans, and reallocate investment.

Learn more

No-code Power BI ServiceNow integration

Power BI Connector for ServiceNow

Seamlessly connect ServiceNow with Power BI, transforming complex enterprise data into actionable insights and driving smarter, data-informed decisions across the organization

Learn more

Align your organization with proactive portfolio management

Portfolio Manager (LiquidPlanner)

Predictive scheduling and the ability to forecast project timelines and spot risks so you can meet deadlines with confidence.

Learn more

Take control of your projects

Portfolio Manager and Jira

Portfolio Manager integrates seamlessly with Jira to give you predictive scheduling, real-time scenario modeling, and advanced resource management – ensuring you stay on track, no matter what challenges arise.

Learn more

Centralize real-time plans in one view

Structure and Gantt Charts

Gain a more complete project management solution, simplifying project reporting, improving collaboration, and ensuring projects stay on time and within budget.

Learn more

Industry-leading project plan and roadmap visualizations with a Gantt chart extension

Gantt Charts for Structure PPM

Visualize project plans and roadmaps with a Gantt chart extension for Jira

Learn more

Jira Portfolio Management PPM

Structure by Tempo

Jira Project Portfolio Management (PPM): Visualize data and manage projects within spreadsheet-like tables — in less than a minute

Go to marketplace

Unified time and team management

Timesheets and Capacity Planner

Seamlessly manage project timelines and resources while accurately tracking time spent on tasks. This integration enhances visibility, improves planning accuracy, and supports data-driven decision-making for better overall project outcomes.

Learn more
Colleagues interacting around a desk

No-Code Power BI Jira Integration

Power BI Connector for Jira

Effortlessly bridge Jira with your preferred BI tool, unlocking unparalleled insights and enhancing decision-making

Learn more

Monitor financial health at every level

Financial Manager

Monitor projects and portfolios to get simple, clear, and real-time views of your costs, budgets, and profits that can be shared throughout your entire organization.

Learn more

Ensure compliance and optimize spending

Governance and auditing

Portfolio governance and auditing excellence

Learn more

Project and program management for Jira

Structure PPM

Visualize all your Jira data & manage portfolios of projects in real-time.

Learn more

Time Tracking Software for Jira

Timesheets

Tempo’s intuitive automation and Jira-native design make it the most trusted time tracking tool for enterprise organization.

Learn more

Unified time and team management

Timesheets and Structure

Combining Tempo Timesheets and Structure PPM provides a unified view of time tracking and project progress, enabling more accurate reporting and effective portfolio management. Simplify workflows, enhance collaboration, and ensure projects stay on time and within budget.

Learn more

Jira Time Tracking

Timesheets by Tempo

#1 Jira Time Tracking & AI Apps: Log Tempo Timesheets for Planning, Project Management & Billing. Plugin Office365, Google & Slack

Go to marketplace

Jira Project Cost Tracking

Financial Manager

Project financial management for Jira & Timesheets. Monitor project costs, expenses, revenue, billing & budgets. Track Capex/Opex

Go to marketplace

No more reporting limitations

Custom Charts for Confluence

Create and share all kinds of highly visual and customizable charts directly on your Confluence pages.

Learn more
Team working together at board with sticky notes

No-code Power BI monday.com integration

Power BI Connector for monday.com

Get powerful data export capabilities and connect monday.com to Power BI effortlessly

Learn more

Strategic portfolio management for PMO leaders

Strategic portfolio management for PMO leaders

Tempo gives PMO directors and portfolio managers the tools to reduce delivery friction, align teams, and drive measurable outcomes.

Learn more

Powered by Structure’s custom hierarchies, visualize your roadmap, project plans, timeline & dependencies within Jira Gantt charts

Go to marketplace

Roadmapping software for teams of all sizes

Strategic Roadmaps (Roadmunk)

The roadmapping tool designed for high-performing teams delivering boardroom-ready strategic roadmaps.

Learn more

Real-time collaboration and capacity planning in Jira

Capacity Planner

A powerful team resource management tool designed to optimize capacity planning and project management in Jira

Learn more

Jira Team & Resource Management

Capacity Planner

#1 Jira Resource Management App: Optimize team allocation, skillset utilization, capacity planning & project management

Go to marketplace

Get the data you need to succeed

Time Tracker

Extend your Jira with prebuilt and highly configurable reports for straightforward time tracking.

Learn more

Never lose track of a brilliant idea again

Idea Manager for Strategic Roadmaps

Never lose a brilliant idea again. Idea Manager for Strategic Roadmaps has built-in best practices to help.

Learn more